UNCLASSIFIED // FOR OFFICIAL USE ONLY
PMA-251 Program Manager briefing

ALRE Enterprise Readiness

Predictive risk across launch & recovery, visual landing aids, wind-measuring, marking & lighting, shore recovery, and USMC EAF systems.

Sensor data: 14 min ago · Model ALRE-PdM v2.4 · PMA-251 / NAWCAD Lakehurst
ALRE System Availability
89%
6 of 7 sites operational
High-Risk Components
1
1 medium-high pending
Unplanned Events Avoided
15
Last 90 days · model attribution
Forecast Downtime
-22%
vs. reactive baseline
Priority Actions
Highest-risk components with recommended next action.
View queue
HighCross-Deck Pendant Wire #1
Arresting Gear (Mk 7 Mod 3) · CVN-78 USS Gerald R. Ford · Engine #2 · Replace within 14 days · confidence 91%
4,821 / 5,200 cycles
Take action
Medium-HighIFLOLS Lens Box — Datum Light Array
Visual Landing Aids (IFLOLS) · LHA-6 USS America · Port Sponson · Schedule lamp array replacement within 30 days · confidence 86%
3,990 / 5,200 cycles
Take action
MediumAAG Water-Twister Hydraulic Actuator
Advanced Arresting Gear (AAG) · CVN-78 · Machinery Room 2 (Starboard) · Inspect hydraulic seals at next maintenance window · confidence 74%
1,840 / 4,000 cycles
Take action
LowEMALS Energy Storage Subsystem — Generator Brushes
Electromagnetic Aircraft Launch System (EMALS) · CVN-78 · Catapult 2 · No action required — monitor · confidence 83%
3,102 / 6,000 cycles
Take action
Risk distribution
By component, current score.
90-day maintenance forecast
Planned vs. unplanned events; avoided is model attribution.
Planned Unplanned Avoided (model)
Highest-risk component — risk over time
Cross-Deck Pendant Wire #1 · projected 2 weeks ahead.
© 2026 Swain Techs·ReadyScout · ALRE Predictive Analytics
ATO: Active·IL-5·CUI·FedRAMP High (in process)·Model validated: 09 Jun 2026
UNCLASSIFIED // FOR OFFICIAL USE ONLY